The final apartment phase of the 30.6-hectare Palm City urban area on the Giong Ong To river, developed by Huong Viet Properties. Four 36-storey towers, 620 apartments, construction started in June 2026, handover expected in Q1 2029.
The rules that apply to every project:
| Legal project name | High-rise residential and commercial block 3 (CC3), Nam Rach Chiec Central Area |
| Investor | Nam Rach Chiec Company Limited |
| Developer | Huong Viet Properties (Huong Viet Holdings) |
| Location | Quarter 19, Binh Trung ward, Ho Chi Minh City — inside Palm City, fronting the Giong Ong To river, beside the Long Thanh expressway service road |
| Site | About 1.9 ha · 4 towers of 36 storeys (around 149 m) · 2 basement levels · building density about 40% |
| Product mix | 620 apartments · 71 officetel units · 13 shophouses · duplexes and penthouses |
| Floor layout | 4 to 6 units per floor, nearly 80% corner units, one parking space per apartment |
| Amenities | More than 68 facilities on the ground floor, level 2 and level 20, where four sky bridges link the towers |
| Former name | Palm Garden — renamed Palm River when Huong Viet took over development |
| Handover | Expected Q1 2029 |
| Studio to 3 bedrooms | 41.3 – 157 m² (gross, wall-centre basis) |
| Corner units | Nearly 80% of all units |
| Duplex, penthouse | Limited number, upper floors |
| Officetel | 71 units |
| Shophouse | 13 units |
The developer does not publish prices; price sheets are issued unit by unit. I will send you the full calculation for a specific unit — price, VAT, the 2% maintenance fund and the payment schedule. Areas follow the official project page, updated 21 October 2026, and are measured on a wall-centre basis rather than the net usable basis used in market reports.
| Legal project name | Clear High-rise residential and commercial block 3 (CC3), Nam Rach Chiec Central Area |
| Construction start | Started 16 June 2026 |
| 1/500 master plan | Adjusted Per developer information released to distribution agents, 2026 |
| Construction permit | Exempted Per developer information released to distribution agents, 2026 |
| First deposit instalment | Controlled The first 5% goes into an escrow savings account in the buyer's own name at OCB, held until the sale contract is signed |
| Eligibility to sell future housing | Being verified Ask to see the Department of Construction letter before signing a sale and purchase agreement |
| Bank guarantee for buyers | To be confirmed Required before signing a contract for housing to be formed in the future |
| Certificates for earlier phases | In process Huong Viet took over Palm City in April 2025 and is processing certificates for the phases handed over earlier |
Green: confirmed. Amber: being verified or not yet available. Ask to see each document before signing.








The investor is Nam Rach Chiec Company Limited and the developer is Huong Viet Properties. The project is the final apartment phase within the 30.6-hectare Palm City urban area.
Four towers of 36 storeys with 620 apartments, 71 officetel units and 13 shophouses. Construction started on 16 June 2026 and handover is expected in Q1 2029.
The developer does not publish prices and issues price sheets unit by unit. I will send you the full calculation — price, VAT, the 2% maintenance fund and the payment schedule — for a unit you are interested in.
The first 5% is paid into an escrow savings account in the buyer's own name at OCB and held until the sale contract is signed. Check that the account name is genuinely yours before transferring.
This is the same phase that was previously named Palm Garden. Huong Viet took over its development in 2025 and renamed it Palm River. Ask about the legal history of the land before buying.
Foreign ownership in any Vietnamese apartment building is capped at 30% of residential units, counted per block. Ask for written, dated confirmation of the remaining allocation in the specific tower before paying a deposit.
I will send you the current price sheet, the payment schedule, and written confirmation of the remaining foreign quota for the block you are interested in. If something about this project does not stand up, I will tell you before you pay a deposit.
A fuller Vietnamese version of this page, with floor plans and the full image set, is at /du-an/palm-river/.